Top Navigation
  • Home
  • About Us
    • Our Story
    • Our Team
    • Mission and Vision
  • Donate
    • Why Donate
    • Payment Methods
Main Navigation
  • News
    • Local
    • National
    • International
  • Development
  • Environment
    • Weather
    • Climate
    • Conservation
    • Biodiversity
    • Natural Disasters
    • Pollution & Waste
    • Energy
    • Ecology
  • Opinion
    • Expert Views
    • Editorials
    • Guest Articles
    • Youth Voices
  • Business
  • Technology
  • Profiles
  • Travels
  • Initiatives
    • Climate Education
    • Policies & Agreements
    • Resources
  • More
    • Events
    • Lifestyle
    • Multimedia
    • Research/Reports
    • Publications
  • Home
  • About Us
    • Our Story
    • Our Team
    • Mission and Vision
  • Donate
    • Why Donate
    • Payment Methods
Sustainable Development Goals Sustainable Development Goals
  • News
    • Local
    • National
    • International
  • Development
  • Environment
    • Weather
    • Climate
    • Conservation
    • Biodiversity
    • Natural Disasters
    • Pollution & Waste
    • Energy
    • Ecology
  • Opinion
    • Expert Views
    • Editorials
    • Guest Articles
    • Youth Voices
  • Business
  • Technology
  • Profiles
  • Travels
  • Initiatives
    • Climate Education
    • Policies & Agreements
    • Resources
  • More
    • Events
    • Lifestyle
    • Multimedia
    • Research/Reports
    • Publications
Search Here
Energy
  • Home
  • Energy
  • Divyajyoti Hydropower Secures Financial Closure for 50 MW Marsyangdi Besi Project
Divyajyoti Hydropower Secures Financial Closure for 50 MW Marsyangdi Besi Project
Ganesh Khatiwada
Ganesh Khatiwada 2026-05-13 18:26:00

Kathmandu, Nepal - Divyajyoti Hydropower Limited has achieved financial closure for the construction of the 50 MW Marsyangdi Besi Hydropower Project, marking a significant step forward in Nepal’s hydropower and energy infrastructure development.
According to the company, the project is being developed along the Marsyangdi River in Tanahun district of Gandaki Province, covering areas of Bandipur Municipality and Myagde Rural Municipality. The financing agreement was formally signed during a program held in Kathmandu in the presence of representatives from the company and participating financial institutions.
The total estimated cost of the project stands at approximately NPR 11.30 billion. Out of the total investment, NPR 7.50 billion will be managed through consortium financing led by Citizens Bank International Limited, while the remaining NPR 3.80 billion will be invested through the company’s equity participation.
Divyajyoti Hydropower stated that although the official construction timeline of the project is four years, the company is working with a target to complete construction within the next 30 months. Once completed, the electricity generated by the project will be connected to the national transmission system through the Nepal Electricity Authority’s 132 kV Udipur Substation, located around eight kilometers from the project’s powerhouse.
The company had previously signed a Power Purchase Agreement (PPA) with the Nepal Electricity Authority in 2074 B.S. and obtained its electricity generation license from the Department of Electricity Development under the Ministry of Energy in 2075 B.S.
The project is expected to contribute to Nepal’s growing renewable energy capacity and support the country’s broader goals of energy security, domestic power generation, and sustainable economic development.
#Nepal #Hydropower #RenewableEnergy #MarsyangdiBesiProject #EnergyDevelopment #SustainableDevelopment #Infrastructure #Electricity #CleanEnergy #GandakiProvince #EcosphereNews


Published Date 2026-05-13 18:26:00
UNV UNV
Comments
UNDP UNDP
More Energy
Upper Tamakoshi Hydropower Project to Halt Power Generation for 10 Hours for Reservoir Cleaning
Upper Tamakoshi Hydropower Project to Halt Power Generation for 10 Hours for Reservoir Cleaning 2026-08-09 13:31:00
Renewable Energy Reaches Historic Turning Point as Wind and Solar Briefly Overtake Gas
Renewable Energy Reaches Historic Turning Point as Wind and Solar Briefly Overtake Gas 2026-07-29 07:57:00
Central Asia Urged to Strengthen Renewable Energy Investment Ecosystem
Central Asia Urged to Strengthen Renewable Energy Investment Ecosystem 2026-07-23 06:56:01
Upper Mewa Khola Hydropower Project Achieves Key Construction Milestone with Access Tunnel Breakthrough
Upper Mewa Khola Hydropower Project Achieves Key Construction Milestone with Access Tunnel Breakthrough 2026-07-01 14:05:00
Spark Hydroelectric Concludes 26th Annual General Meeting, Endorses Key Financial and Strategic Decisions
Spark Hydroelectric Concludes 26th Annual General Meeting, Endorses Key Financial and Strategic Decisions 2026-06-22 12:37:00
Nepal’s Hydropower Sector Shows Strong Financial Performance as Leading Companies Report Robust Profits
Nepal’s Hydropower Sector Shows Strong Financial Performance as Leading Companies Report Robust Profits 2026-06-16 19:38:00
Lower Erkhuwa Hydropower Holds 7th Annual General Meeting in Kathmandu, Advances IPO and Governance Agendas
Lower Erkhuwa Hydropower Holds 7th Annual General Meeting in Kathmandu, Advances IPO and Governance Agendas 2026-06-12 22:01:00
Online Test Prep Online Test Prep
Most Loved
  • Week
  • Month
YADEA Nepal Launches GS70, GT70 and GT80 Electric Scooters, Strengthening Smart Mobility in Nepal
YADEA Nepal Launches GS70, GT70 and GT80 Electric Scooters, Strengthening Smart Mobility in Nepal
Nepal’s “One School One Nurse” Program Expands School Health Services Nationwide
Nepal’s “One School One Nurse” Program Expands School Health Services Nationwide
Kathmandu Valley Moves Toward Human-Centric Urban Mobility Vision
Kathmandu Valley Moves Toward Human-Centric Urban Mobility Vision
Lalitpur Restores Historic Saptapatal Pokhari to Its Original Form
Lalitpur Restores Historic Saptapatal Pokhari to Its Original Form
China Moves Closer to Finalising National Biodiversity Finance Taxonomy
China Moves Closer to Finalising National Biodiversity Finance Taxonomy
National Consultation Highlights Nepal’s Water and Sanitation Challenges Despite Major Access Gains
National Consultation Highlights Nepal’s Water and Sanitation Challenges Despite Major Access Gains
YADEA Nepal Launches GS70, GT70 and GT80 Electric Scooters, Strengthening Smart Mobility in Nepal
YADEA Nepal Launches GS70, GT70 and GT80 Electric Scooters, Strengthening Smart Mobility in Nepal
Nepal’s “One School One Nurse” Program Expands School Health Services Nationwide
Nepal’s “One School One Nurse” Program Expands School Health Services Nationwide
Nationwide Highway Disruptions Continue as Monsoon Rains Affect Key Transport Corridors Across Nepal
Nationwide Highway Disruptions Continue as Monsoon Rains Affect Key Transport Corridors Across Nepal
Deadly Storms and Flooding Claim Lives, Displace Hundreds Across Chile
Deadly Storms and Flooding Claim Lives, Displace Hundreds Across Chile
Awareness Awareness
Contact Us

News Desk

Ecosphere News
Chakupat, Lalitpur, Nepal
Phone : +977-01-5400646
Email: [email protected] www.ecospherenews.com

Sales & Marketing

Email: [email protected]
Cell Phone: 9820631466 / 9767470774
Media Details
Publisher Ecosphere News and Travels Pvt. Ltd.
DOIB Registration No. 4699-2081/2082
Editor Ganesh Khatiwada
Follow us on Twiitter

Nature’s Healing Touch: Summer River Swim Brings Peace and Joy https://t.co/J2GfWcNdj0

— Ecosphere News (@EcosphereNews) March 20, 2026
Like us on Facebook
© 2026 Ecosphere News Environmental & Developmental Issues. All Rights Reserved. Site by: SoftNEP

SoftNEP News Alert

अख्तियार स्वतन्त्र निकाय भएकाले वाइडबडि छानबिनमा अहिलेसम्‍म कुनै किसिमको राजनीतिक दबाब आएको छैन।स्वतन्त्र ढंगले काम गरिरहेका छौ।
सदस्यता लिनुहोस्