Top Navigation
  • Home
  • About Us
    • Our Story
    • Our Team
    • Mission and Vision
  • Donate
    • Why Donate
    • Payment Methods
Main Navigation
  • News
    • Local
    • National
    • International
  • Development
  • Environment
    • Weather
    • Climate
    • Conservation
    • Biodiversity
    • Natural Disasters
    • Pollution & Waste
    • Energy
    • Ecology
  • Opinion
    • Expert Views
    • Editorials
    • Guest Articles
    • Youth Voices
  • Business
  • Technology
  • Profiles
  • Travels
  • Initiatives
    • Climate Education
    • Policies & Agreements
    • Resources
  • More
    • Events
    • Lifestyle
    • Multimedia
    • Research/Reports
    • Publications
  • Home
  • About Us
    • Our Story
    • Our Team
    • Mission and Vision
  • Donate
    • Why Donate
    • Payment Methods
Sustainable Development Goals Sustainable Development Goals
  • News
    • Local
    • National
    • International
  • Development
  • Environment
    • Weather
    • Climate
    • Conservation
    • Biodiversity
    • Natural Disasters
    • Pollution & Waste
    • Energy
    • Ecology
  • Opinion
    • Expert Views
    • Editorials
    • Guest Articles
    • Youth Voices
  • Business
  • Technology
  • Profiles
  • Travels
  • Initiatives
    • Climate Education
    • Policies & Agreements
    • Resources
  • More
    • Events
    • Lifestyle
    • Multimedia
    • Research/Reports
    • Publications
Search Here
National
  • Home
  • National
  • Nepal Plans Parallel Road Along Trishuli River to Improve Resilience of Muglin-Narayanghat Highway
Nepal Plans Parallel Road Along Trishuli River to Improve Resilience of Muglin-Narayanghat Highway
Ganesh Khatiwada
Ganesh Khatiwada 2026-07-25 07:15:00

Kathmandu, July 25 - The Department of Roads (DoR) has initiated the alignment survey for a proposed parallel road along the Trishuli River as an alternative to the landslide-prone Muglin–Narayanghat highway, one of Nepal's busiest transport corridors. The proposed route aims to enhance year-round connectivity and reduce repeated traffic disruptions during the monsoon season.
According to DoR Director General Dr. Bijay Jaisi, route alignment work is currently underway while local governments and concerned road divisions have already begun opening tracks at various locations along the proposed corridor. He said the department will formally begin construction once track excavation is completed across the entire alignment.
The Muglin–Narayanghat road, stretching approximately 35 kilometres, has long been considered one of Nepal's most vulnerable highway sections due to recurring landslides. Despite a World Bank-supported upgrading project completed in 2018, which widened the roadway from about 5.5 metres to 9-11 metres at a cost exceeding NPR 2 billion, the highway continues to experience frequent disruptions during the monsoon.
Officials from the Chitwan Road Division reported that this year's monsoon has triggered repeated landslides at several critical locations, including Tuinkhola, Jalbire and Setidobhan, repeatedly blocking traffic. Permanent slope stabilisation work worth NPR 220 million has already commenced at Tuinkhola to reduce future risks, while emergency clearance operations generally restore traffic within one to two hours after blockages occur.
Experts attribute the recurring landslides to both natural geological conditions and human activities. The highway passes through one of Nepal's most geologically fragile zones, lying close to the Main Central Thrust (MCT) and Main Boundary Thrust (MBT) fault systems, where the Indian and Tibetan tectonic plates interact. These geological formations have weakened the underlying rocks and soils, making the area highly susceptible to slope failures.
Geotechnical experts also argue that the engineering design during the highway's upgrading did not sufficiently account for the area's complex geological conditions. They note that while extensive geological engineering and slope protection measures were incorporated during the construction of the BP Highway, similar levels of geotechnical intervention were not fully applied along the Muglin-Narayanghat section.
Authorities have further identified unplanned hillside development, indiscriminate road-track excavation, and unmanaged land plotting above the highway as additional factors destabilising slopes and increasing landslide risks during even moderate rainfall.
Experts recommend stricter regulation of construction activities within the highway's watershed and surrounding buffer zones, warning that infrastructure development in unstable terrain should be guided by detailed geological assessments and long-term slope management strategies.
The proposed parallel road is expected to strengthen the resilience of Nepal's principal transport corridor linking Kathmandu with the country's eastern and western regions, while improving disaster preparedness and reducing the economic losses caused by recurring highway closures during the monsoon.
#EcosphereNews #Nepal #DepartmentOfRoads #MuglinNarayanghat #Trishuli #Infrastructure #RoadSafety #LandslideRisk #ClimateResilience #DisasterRiskReduction #SustainableInfrastructure #Transport #Geology #Monsoon #NepalDevelopment


Published Date 2026-07-25 07:15:00
UNV UNV
Comments
UNDP UNDP
More National
Nepal’s “One School One Nurse” Program Expands School Health Services Nationwide
Nepal’s “One School One Nurse” Program Expands School Health Services Nationwide 2026-08-06 18:26:00
Snakebite Emerges as Leading Cause of Monsoon-Related Disaster Deaths in Nepal
Snakebite Emerges as Leading Cause of Monsoon-Related Disaster Deaths in Nepal 2026-08-04 15:35:00
SPARSHA Nepal Hosts High-Level Panel Discussion to Advance Hepatitis Elimination in Nepal
SPARSHA Nepal Hosts High-Level Panel Discussion to Advance Hepatitis Elimination in Nepal 2026-07-29 17:11:00
Prime Minister’s Appeal: Condolences Over Sunsari Incident, Commitment to Legal Action Against the Guilty and Justice for Victims
Prime Minister’s Appeal: Condolences Over Sunsari Incident, Commitment to Legal Action Against the Guilty and Justice for Victims 2026-07-29 06:07:47
Government Urges Hospitals to Continue Services, Legal Action Against Attackers Underway
Government Urges Hospitals to Continue Services, Legal Action Against Attackers Underway 2026-07-28 11:54:00
Landslide in Dhading Displaces Families and Disrupts Drinking Water Supply
Landslide in Dhading Displaces Families and Disrupts Drinking Water Supply 2026-07-22 10:27:00
Online Test Prep Online Test Prep
Most Loved
  • Week
  • Month
YADEA Nepal Launches GS70, GT70 and GT80 Electric Scooters, Strengthening Smart Mobility in Nepal
YADEA Nepal Launches GS70, GT70 and GT80 Electric Scooters, Strengthening Smart Mobility in Nepal
Nepal’s “One School One Nurse” Program Expands School Health Services Nationwide
Nepal’s “One School One Nurse” Program Expands School Health Services Nationwide
Urban Dabali Calls for Coordinated Action and Nature-Based Solutions to Address Kathmandu Valley’s Recurring Floods
Urban Dabali Calls for Coordinated Action and Nature-Based Solutions to Address Kathmandu Valley’s Recurring Floods
El Niño Intensifies as WMO Warns of Widespread Global Heat, Rainfall Shifts and Rising Climate Risks
El Niño Intensifies as WMO Warns of Widespread Global Heat, Rainfall Shifts and Rising Climate Risks
China Moves Closer to Finalising National Biodiversity Finance Taxonomy
China Moves Closer to Finalising National Biodiversity Finance Taxonomy
National Consultation Highlights Nepal’s Water and Sanitation Challenges Despite Major Access Gains
National Consultation Highlights Nepal’s Water and Sanitation Challenges Despite Major Access Gains
Thamel Tourism Development Council to Hold Board Election on Asar 27
Thamel Tourism Development Council to Hold Board Election on Asar 27
YADEA Nepal Launches GS70, GT70 and GT80 Electric Scooters, Strengthening Smart Mobility in Nepal
YADEA Nepal Launches GS70, GT70 and GT80 Electric Scooters, Strengthening Smart Mobility in Nepal
Nationwide Highway Disruptions Continue as Monsoon Rains Affect Key Transport Corridors Across Nepal
Nationwide Highway Disruptions Continue as Monsoon Rains Affect Key Transport Corridors Across Nepal
Deadly Storms and Flooding Claim Lives, Displace Hundreds Across Chile
Deadly Storms and Flooding Claim Lives, Displace Hundreds Across Chile
Awareness Awareness
Contact Us

News Desk

Ecosphere News
Chakupat, Lalitpur, Nepal
Phone : +977-01-5400646
Email: [email protected] www.ecospherenews.com

Sales & Marketing

Email: [email protected]
Cell Phone: 9820631466 / 9767470774
Media Details
Publisher Ecosphere News and Travels Pvt. Ltd.
DOIB Registration No. 4699-2081/2082
Editor Ganesh Khatiwada
Follow us on Twiitter

Nature’s Healing Touch: Summer River Swim Brings Peace and Joy https://t.co/J2GfWcNdj0

— Ecosphere News (@EcosphereNews) March 20, 2026
Like us on Facebook
© 2026 Ecosphere News Environmental & Developmental Issues. All Rights Reserved. Site by: SoftNEP

SoftNEP News Alert

अख्तियार स्वतन्त्र निकाय भएकाले वाइडबडि छानबिनमा अहिलेसम्‍म कुनै किसिमको राजनीतिक दबाब आएको छैन।स्वतन्त्र ढंगले काम गरिरहेका छौ।
सदस्यता लिनुहोस्